BG-RRP-5.003-0001-C04
C8.I6 Ensuring sustainable transport connectivity through the construction of Stage 3 of Line 3 of the metro in Sofia - "Hadji Dimitar" metro station - "Levski-G" residential area
RRF ==>
Recovery and Resilience Plan
000697371 Ministry of Environment and Water
27.07.2022
27.07.2022
18.04.2023
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Sofia