Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 715 TREES
Български

Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-5.003-0001-C04
C8.I6 Ensuring sustainable transport connectivity through the construction of Stage 3 of Line 3 of the metro in Sofia - "Hadji Dimitar" metro station - "Levski-G" residential area
000662018 12
000697371 Ministry of Environment and Water
27.07.2022
27.07.2022
18.04.2023
In execution (starting date)
Location of Performance
  • Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Sofia

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).