BG1846-1.003-0002-C05
Second project Type of costs
EEA FM ==>
Program for Optimizations and Testing
000014306 test
10.03.2020
10.03.2020
25.09.2023
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Smolyan (BG424), Smolyan
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Burgas (BG341), Burgas