Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 70 048 TREES
Български

Programme: Regions in Growth 2014-2020

Planning region: All

Financial Information

4 019 223.47 EUR
3 908 678.30 EUR
110 545.17 EUR
3 908 678.29 EUR
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 5.00 33 132.95 0.00 33 132.95 Association "DG Kalinka 2017"
Нарушения в документацията за обществени поръчки 5.00 36 553.72 0.00 36 553.72 DZZD Leader Engineering 2016
Нарушения в документацията за обществени поръчки 5.00 46 363.76 0.00 46 363.76 Association "Educational Infrastructure Montana 2017"
Нарушения в документацията за обществени поръчки 5.00 78 614.74 0.00 78 614.74 INFRA ROADS Ltd
Нарушения в документацията за обществени поръчки 10.00 3 190.46 0.00 3 190.46 ATI Consult Ltd
Нарушения в документацията за обществени поръчки 10.00 6 074.15 0.00 6 074.15 ATI Consult Ltd
Нарушения в документацията за обществени поръчки 10.00 3 946.36 0.00 3 946.36 Association Evro Project
Нарушения в документацията за обществени поръчки 10.00 2 619.86 0.00 2 619.86 Stroitelen standart Ltd

Notes:

* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).