Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 70 046 TREES
Български

Programme: Environment 2014-2020

Planning region: All

Financial Information

28 330 860.02 EUR
25 354 779.76 EUR
2 976 080.26 EUR
25 237 692.10 EUR
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 5.00 1 564.73 176.76 1 741.49 J amp; I Ltd.
Нарушения в документацията за обществени поръчки 5.00 1 556.20 175.80 1 732.00 Astatera Ltd.
Нарушения в документацията за обществени поръчки** 10.00 64 783.99 7 318.39 72 102.38 DZZD Water GIS Design - Silistra
Нарушения в документацията за обществени поръчки** 5.00 167 288.85 18 897.97 186 186.82 DZZD ELIT VIK SILISTRA
Нарушения в документацията за обществени поръчки** 25.00 2 510 494.32 283 600.64 2 794 094.96 DZZD KV SILISTRA 2020
Нарушения в документацията за обществени поръчки** 25.00 2 252 343.99 254 438.41 2 506 782.40 DZZD KV SILISTRA 2020
Нарушения в документацията за обществени поръчки** 25.00 934 728.07 105 592.55 1 040 320.62 KV DOROSTOL 2020
Нарушения в документацията за обществени поръчки** 30.00 160 322.34 18 110.98 178 433.32 DZZD Ingeneering Tutrakan 2020
Нарушения в документацията за обществени поръчки** 25.00 1 124 151.89 126 991.01 1 251 142.90 DZZD Evroingeneering -2020
Нарушения в документацията за обществени поръчки** 5.00 10 106.71 1 141.71 11 248.42 Interkonsult
Нарушения в документацията за обществени поръчки** 5.00 22 227.11 2 510.90 24 738.01 Geostroi Konsult
Нарушения в документацията за обществени поръчки** 5.00 69 675.02 7 870.91 77 545.93 DZZD "OBEDINENIE VER BG08"
Нарушения в документацията за обществени поръчки** 5.00 2 076.11 234.53 2 310.64 DRUSTAR MEDIA GROUP LTD

Notes:

* The amount of the actual amounts paid cumulative
** The beneficiary disputes the financial correction in court in accordance with the Administrative Procedure Code.
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).