Financial Information

4 191 965.30 EUR
3 732 943.90 EUR
459 021.40 EUR
3 732 943.90 EUR
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 5.00 7 541.00 927.27 8 468.27 KONSULTANTSKA INZHENERNA GRUPA OOD
Нарушения в документацията за обществени поръчки 10.00 352 426.64 43 336.02 395 762.66 MAGINGENERING RAZGRAD 2019
Нарушения в документацията за обществени поръчки** 5.00 8 297.48 1 020.30 9 317.78 Ecodjen OOD
Нарушения в документацията за обществени поръчки** 10.00 3 641.99 447.83 4 089.82 Zlatex
Нарушения в документацията за обществени поръчки 5.00 6 345.48 780.27 7 125.75 „S amp; S METAL“ LTD
Нарушения в документацията за обществени поръчки 25.00 14 911.25 1 833.56 16 744.81 Ingconsult EOOD
Нарушения в документацията за обществени поръчки 25.00 25 497.10 3 135.25 28 632.35 Ingconsult EOOD

Notes:

* The amount of the actual amounts paid cumulative
** The beneficiary disputes the financial correction in court in accordance with the Administrative Procedure Code.
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).